Delivery Time and Terms

1. Delivery term

  1. Delivery takes 3 to 5 business days for equipment in stock and 30 to 45 business days for equipment ordered from the manufacturer, unless the contract or offer expressly specifies a different timeframe.
  2. The agreed delivery period begins on the first following working day from the date of cumulative fulfillment of the following conditions:
    • Registration of advance payments to the Seller’s current account (if an advance has been agreed upon);
    • Delivery of all necessary technical and logistical data by the Customer (exact address, contact person for reception, working hours of reception, specifics of access to the facility).
  3. The delivery deadline is automatically extended for the duration of circumstances that the Seller cannot objectively influence (force majeure, carrier strikes, stoppages at customs terminals, extreme weather events), about which the Seller is obliged to notify the Buyer in writing without delay.

2. Delivery method and place

  1. Delivery is made to the address of the Customer's facility indicated in the contract/order form (DAP — Delivered at Place, to the Customer’s facility in the Republic of Serbia).
  2. The Seller arranges transport of the equipment to the exterior entrance or unloading area of the Customer’s facility.
  3. The Customer must provide, at its own expense and risk:
    • Unobstructed access for the delivery vehicle to the facility;
    • Unloading and vertical or horizontal transport of the equipment to the installation site, including a suitable freight elevator and adequate aisle and doorway widths;
    • Presence of an authorized representative to inspect the equipment and confirm its quantity and condition.

3. Transfer of risk and inspection of goods

  1. The risk of accidental loss or damage to the goods passes from the Seller to the Buyer at the moment when the Seller makes the goods available to the Buyer at the agreed place of delivery (before the start of unloading).
  2. The Buyer must visually inspect the transport packaging upon delivery. If visible mechanical damage to the packaging or goods is found, the Buyer must prepare a damage report and take photographs immediately in the presence of the driver or delivery person, then send them to the Seller within 24 hours.
  3. By signing the delivery note or handover report without objections, the Buyer confirms that the goods were delivered in externally undamaged condition and in the agreed quantity (Article 481 of the Serbian Law on Obligations).

4. Customer delay and storage charges

  1. If the Buyer unjustifiably refuses to accept the goods, does not provide the conditions for unloading or postpones the collection after being informed about the readiness of the goods for delivery:
    • The risk of accidental loss or damage to the goods passes to the Buyer on the day the goods are offered for acceptance;
    • The customer bears the actual costs of return transport and storage of the goods (storage charges) in the amount of 0.5% of the value of the stored equipment per day of delay, starting from the third working day of the delay.
  2. If the Buyer's delay lasts longer than 15 (fifteen) calendar days, the Seller has the right to unilaterally terminate the contract in writing, keep the paid advance in the name of contractual penalty and damages, and sell the equipment to a third party.